Click on images below for full size Photo |
 |
 |
|
 |
 |
 |
 |
Stripdown started |
 |
 |
 |
 |
|
The bulkhead/firewall coming off
|
Here is the engine & transmission coming up |
|
 |
 |
 |
 |
A little surgery required to get the steering
relay out of the chassis
|
The old rusty chassis finally out of the
garage |
Before and After!
|
 |
 |
 |
 |
Teardown
of the front axle assembly |
|
 |
 |
|
 |
First little shipment of parts. New galvanized chassis, new
springs & shocks, new stainless exhaust, rebuilt transmission, rebuilt
engine assembly, all new brake lines & hydraulics, new Michelin XZL
tires, new wheels, new radiator, etc. |
|
Test fit the bulkhead on the new chassis Temporarily mount the
brake & clutch pedal boxes, bend the new brake & clutch lines to fit,
then take it all apart for final sandblast & paint |
 |
 |
 |
 |
Bulkhead repaired and re-sprayed |
 |
 |
 |
 |
New
distributor installed along with the oil filter assembly and manifolds,
rebuilt the original AC fuel pump, had the flywheel resurfaced,
installed a new clutch, and the engine is finally in |
Thoroughly cleaned under side of the rear tub, coated with
several layers of 3M rubberized undercoating |
 |
 |
 |
 |
|
Test fit the rear body |
|
 |
|
 |
 |
|
|
|
|
 |
 |
 |
 |
|
|
|
|
 |
 |
 |
 |
|
|
|
|
 |
 |
 |
 |
|
|
|
|
|
|
|
|
 |
 |
 |
 |
|
|
|
|
 |
 |
 |
 |
|
|
|
|
 |
 |
 |
 |
|
|
|
|
|
|
|
|
|
|
|
|